Professional indemnity insurance for engineers can cover claims that a design, calculation or inspection caused a loss. Depending on your state and discipline, your registration may expect you to hold it, and most client contracts ask for $1m to $5m.

On this page
Why you need it: registration and contracts
Rules differ by state and discipline. In Queensland the BPEQ code expects registered engineers to hold appropriate PI or tell the client in writing that they do not. Other states and schemes may set their own rules. Check whether your state or registration body sets a minimum; we can confirm it for you. Clients also write limits into contracts.
Typical limits
$1m to $5m for small consultancies. Building and government work often asks for $5m to $10m and a run-off periodPI for someone who has stopped doing new work, for example after retiring, closing a business or becoming an employee. It covers claims made during the run-off period about work you did before you stopped. It does not cover new work. of six years or more.
Your contract or regulator sets the minimum. If they differ, the higher one applies. How to choose a limit. Price depends on your turnover, limit and claims history: what moves the price.
What insurers will ask you
Your disciplines, and the share of each
Insurers group engineering work by what a failure could cost. Give a split of your fees by discipline, because some higher-risk work is easier to place when it is a small part of what you do.
Whether you take on construction responsibility
This changes the answer most. Design and constructA contract where one party, usually the builder, is responsible for both the design and the construction. The builder often engages its own designers, or takes over the owner's designers by novation. (D&C) work is a separate, higher-risk class that insurers usually review job by job. Joint ventures and contracts that make you responsible for construction raise the risk too.
Who engages the other consultants and builders
The risk is lower if you advise and the client contracts them directly. If you engage subconsultants or builders yourself, you take on some of their liability.
Project size, height and the contract
Insurers look at contract values, building heights and whether a technique is new. They also read what the contract says about your liability.
How insurers group engineering work
Insurers group engineering work roughly by what a failure could cost. They look at the size of the loss, ground conditions, project scale and whether the methods are proven. These are typical examples, not fixed rules.
Lower
Band 1 of 4.Smaller losses, and usually no major foundation or structural work.
- Acoustics
- Hydraulics and plumbing
- Environmental
- Road civil, without big bridges or tunnels
- Refurbishments and fit-outs
- Low-rise, lower-value buildings
Middle
Band 2 of 4.More complexity and value, but the methods are well established.
- General civil
- Smaller general structural work
- Mechanical and electrical
- Above-ground mining infrastructure
- Higher-value commercial, residential and retail buildings
- Mid-sized bridges
Higher
Band 3 of 4.Hard ground, large projects, or a failure that stops something expensive from running.
- Geotechnical
- Structural
- Large bridges, dams and tunnels
- Harbours and jetties
- Railways and water
- High-rise structural
- Below-ground mining
- Oil and gas
- Process and control
Highest
Band 4 of 4.A plant failure can be enormous, and new methods have no track record.
- Mineral processing
- Plant design
- Offshore and marine
- Large tunnels in poor ground
- Untried or novel design methods
Work that gets a closer look
- Aerospace, naval, nuclear, chemical and geotechnical work. Insurers want to understand the actual work closely, so a broker takes it to them individually.
- Certification and sign-offs. If you certify work, expect extra questions. Structural sign-offs and compliance certificates can be high risk, depending on the project.
- Pre-purchase inspections. Few insurers want this work. Tell your broker if you do any.
- Novated design. If your appointment passes from the client to the builder, cover for that is an extensionExtra cover added to a policy, either built into the wording or added for an extra premium. In PI, examples can include loss of documents, dishonesty of employees or some cyber events. What is included varies widely between policies. to ask for.
- Project management. Many engineers do some. Policies can add it or exclude it, so insurers ask what your project management involves.
Cover gaps to know about
- Liability you accept in a contract, beyond what the law would place on you anyway, is usually excluded.
- Cover for the cost of fixing a problem before it becomes a claim is not automatic. It is an extension, and it can cost more.
- An unpaid invoiceMoney a client owes you for your work. PI does not pay it, because a client not paying is a commercial risk, not a claim against you. If the client answers your invoice with a claim that your work was negligent, that claim can be covered. is not a claim, so PI will not pay it. A client's demand for its fees back is usually excluded too. A negligence claim the client makes in reply can be covered.
What can go wrong
Illustrative scenarios, not real claims.
A slab that cracked
A house slab you specified cracks within two years. The owner claims repair costs and the builder joins you to the claim.
Services that did not fit
Your mechanical layout clashes with the structure on site. The builder claims the cost of redesign and the delay.
How claims usually happen
A typical pattern, not a real claim
A building is finished and a defect appears: cracking, water getting in, or movement. The owner sues. The builder, the designers and the engineers are all drawn in, and each has to be defended, even those who end up with little or no liability.
- Engineers are rarely sued alone. You are usually one of several defendants, sometimes the main one.
- Construction claims are expensive and complex, because every party that worked on the project tends to be drawn in.
- Defence costsThe cost of investigating and defending a claim, such as lawyers and expert witnesses. PI can pay them for a covered claim, even one with no merit. Policies usually require the insurer's consent before costs are spent. build up even when you end up with little or no liability, so the policy's defence cover is real protection.
- This is one reason minimum premiums and excesses for construction work are set high.
During construction
Buildability problems, redesign and delay.
The first few years after completion
Many claims arrive here: cracking, water getting in, movement.
Years later
Some claims arrive long after the job.
Tip. Keep cover continuous, and plan run-off before you stop practising. A claim years later needs a policy in force when it is made.
How most PI claims start The same pattern across consulting, engineering and IT, and what is and is not covered.
What helps your application
- A split of your fees by discipline and by type of project.
- Clear detail on any design and construct, joint venture or certification work.
- Who engages the subconsultants and builders on your projects.
- The contract terms you usually sign, especially on liability.
Every enquiry is reviewed by Alex, who takes it to insurers with this detail.
Common exclusions to watch
- Cladding and combustible facades
- Work done before your retroactive dateThe earliest date of work your policy covers. Work done before it is not covered, even if the claim arrives while you are insured. It is shown on your policy schedule, and some policies have no cut-off date at all.
- Guarantees of fitness for purposeA promise that your work will achieve a stated result or suit a particular use. The law usually expects professionals to use reasonable care and skill, not to guarantee an outcome.
- Projects over a size you did not declare
Wording differs between policies. Read the policy wordingThe full legal document that sets out the cover, the exclusions and the conditions. It is the same for everyone who buys that product. Your schedule and any endorsements apply it to you., or ask us to point out what it says.
Know how your cover works
Types of engineers
Structural engineers
Rated more carefully, and most go to a broker. See the structural engineers page. Structural engineers.
Civil engineers
Roads, drainage and subdivisions. Council and developer contracts set the limit.
Mechanical, electrical and hydraulic engineers
Building services design. Insurers ask what share is design versus inspection.
Geotechnical engineers
Harder to place. A broker will usually handle this.
Related occupations
- Structural engineersYour registration body may expect it
- ArchitectsMost state boards expect it
- Building designers and draftersRegistration may expect it in some states
- Building surveyors and certifiersYour licence sets insurance conditions
- Bushfire and planning consultantsUsually asked for in client contracts
Common questions
Do engineers need professional indemnity insurance?
Rules differ by state and discipline. In Queensland the BPEQ code expects registered engineers to hold appropriate PI or tell the client in writing that they do not. Other states and schemes may set their own rules. Check whether your state or registration body sets a minimum; we can confirm it for you. Clients also write limits into contracts.
How much PI cover do engineers need?
$1m to $5m for small consultancies. Building and government work often asks for $5m to $10m and a run-off period of six years or more.
Why does my engineering PI need run-off?
Defects can surface years after a job. PI is claims-made, so a claim is only covered if a policy is in force when it is made. Run-off keeps cover after you stop practising.
Why does defence cover matter so much for engineers?
Construction claims usually draw in several defendants. Defence costs build up even when you end up with little or no liability, so the policy's defence cover is real protection.
Does PI cover a client who will not pay my invoice?
No. An unpaid fee is a commercial risk PI is not designed for, and a client's demand for its fees back is usually excluded too. If the client answers your invoice with a claim that your work was negligent, that claim can be covered. Talk to your broker before you push hard for payment.
Why is there no price on this site?
A PI premium depends on detail: what you do, your turnover, the limit you need and your claims history. A rough figure could mislead you, so a broker gets real quotes from insurers once they have your answers.
What does claims-made mean?
PI covers claims made against you while the policy is in force, for work done after your retroactive date. Keep cover continuous so older work stays protected.